Emergency Boiler Replacement at the 375th Medical Group Building 1530

Scott AFB Clinic, Scott AFB, Illinois
Contract amount: $2,873,286.23

Replace a failed high pressure steam boiler sized for summer clinic loads and associated accessories.

Determine the temporary construction required to separate the construction zones from other surrounding clinical and administrative spaces.

 

CLIENT
U.S. Air Force / U.S. Army Huntsville Center Corps of Engineers,
4820 University Square
Huntsville, AL-35816-1022
CEHNC-CT-A